back     print


Profile

Robert Lea ACII FCILA FUEDI-ELAE
Technical Director
National Group
National Role
Contact Details
Email:
robert.lea@mclarens.com
Office phone:
+66 (0)2 636-3200
Extension:
137
Mobile / Cell:
+66 (0)81 837-2714
Office fax:
+66 (0)2 636-0240 / 1
Address Details
Office:
Level 17 Abdulrahim Place,
990 Rama IV Road,
Silom, Bangrak,
Bangkok 10500
Thailand
Postal:
Level 17 Abdulrahim Place,
990 Rama IV Road,
Silom, Bangrak,
Bangkok 10500
Thailand
Industry Certification
  • ACII
  • FCILA
Qualifications
Associate of Chartered Insurance Institute
Fellow of Chartered Institute of Loss Adjusters
European Loss Adjusting Expert
Expertise
  • Casualty
  • Claims Management
  • Energy
  • Oil & Gas
  • Property
  • Technical Services
  • Utilities
Other Expertise
Major property losses
Engineering claims
Business interruption
Adjuster Title
  • Director
Adjuster Year Experience
29
Language Skills
  • English
  • Thai
Background
Joined the Norwich Union Group in 1977 and gained experience in underwriting and claims in both personal and commercial lines.
Entered loss adjusting with a leading international company in 1984 and after completion of the CILA exams in 1989, progressed to dealing with large commercial and domestic losses including business interruption, and was a member of Major Crime and Transit Division.
In December 1987 assisted for five weeks as manager of a temporary office in Puerto Rico following Hurricane Hugo, controlling losses up to USD 4 million.
In 1992 assisted in opening a new office in Birmingham, England and was later appointed Area Manager for the East Midlands controlling three offices.
In June 1996, joined another international adjusting office in Bangkok, Thailand. Two years later moved to join McLarens (Thailand) Ltd.

Robert is a Thai citizen and has an excellent understanding of both written and spoken Thai.

Sample CAR / EAR Experience
Various losses during erection of a fertiliser plant including DSU exposure
Fire at a hotel under construction
Various losses at 1,470MW steam turbine generating plant under construction
Various losses at monomer plant under construction
Various breakdowns of LM 6000 gas turbines with Business Interruption during testing
Various losses at 717MW x 2 coal fired power plant
Collapse of river bridge during construction

Fire in Hydrocracker expansion project and DSU
Storm damage at Wind Farm with DSU

Sample General Property Experience
Flood at a motor vehicle component factory
Fire at a toy factory
Fire at a shoe manufacturer in Vietnam involving document substantiation at the Insured’s head office in Taiwan
Fire at a slipper manufacturers
Crane collapse in Bangladesh
Fire at white goods manufacturer
Fire at a plastic pipe manufacturer including business interruption
Fire at a yarn manufacturers
Flood at a textile manufacturers
Fire at a video/music store including Business Interruption
Settler tank failure at a copper mine in Myanmar
Overheating of Soya beans in a silo in Vietnam
Fire damage to stock of satellite receiving equipment for cable TV company
Collapse and write-off of a 400-ton Liebherr crane
Dropping of a Caterpillar pipe-laying machine during loading onto a ship in Malaysia
Fire at a plastic bag manufacturers in Vietnam
Flooding including Business Interruption due to denial of access/damage at suppliers premises at Coca Cola, Danang, Vietnam
Failure of a pond liner to a wastewater treatment plant at a latex glove manufacturer including Business Interruption
Electrical breakdown and Business Interruption at steel strip mill
Various fires at textile manufacturers
Breakdown of electroliser and Business Interruption
Breakdown of Renk gearboxes at coal mill
Failure of Cold Rolling Mill gearbox
Tantalum powder ignited inside PVA Vacuum Furnace and Business Interruption
Fire at optical glass disc manufacturer
Various fires and Business Interruption at rigid plastic manufacturer
Various losses arising from the tsunami on 26/12/2004 including Property Damage losses up to USD 22m and Business Interruption losses to USD 33m including two cases that went to arbitration
Fire at sports shoe factory that destroyed warehouse
Fire at latex glove manufacturer and Business Interruption

Various fire losses following the Bangkok riots in May 2010 including CentralWorld
Numerous multi-million USD Property Damage and Business Interruption losses (including Contingent Business Interruption) following the 2011 Thai floods

Sample Oil, Gas and Petrochemical Experience
Compressor failure at an olefins plant including ALOP exposure
Explosion and fire at an oil refinery tank farm including Business Interruption
Pressure swing absorber failure and Business Interruption
Leaking ball valves
Lightning strike to Naphtha tank
Damage to Vacuum Distillation Unit
Fire at lubricant oil plant
Fire damage to ethylene tank
Damaged extruder at HDPE plant and Business Interruption
Failure of tantalum heat exchanger due to hydrogen embrittlement
Explosion at gas processing plant
Temperature runaway at refinery and Business Interruption
Explosion and fire at Butadiene Plant including Business Interruption

Explosion and fire at refinery involving atmospheric distillation column and Business Interruption
Implosion of Jet A-1 20,000,000 litre storage tank

Sample Powergen Experience
FOD to a gas turbine
Catastrophic pipework failure of a steam turbine
Bucket failure to a steam turbine including Business Interruption and negotiations with Insured/Insurers/Reinsurers in Japan
Breakdown of a generator including Business Interruption at a dairy in Vietnam
Various boiler breakdowns
FOD to GE Frame MS9001FA+e gas turbine
Short-circuiting of ABB 7.6 MW generator
Breakdown of 60 MVA transformer during testing with DSU
Various GE LM 6000PC 45MW gas turbine inlet gearbox failures
GE LM 6000PC 45MW gas turbine damage due to engine stall during 100% load rejection test and Business Interruption
Fire at FGD plant to 735MW MHI thermal power plant and Business Interruption
Breakdown of GE Frame MS9001FA+e gas turbine due to fretting of rotor blades
Various claims for cracking to stage one rotor discs to frame 9 turbines
Cracked ID exhaust fan and Business Interruption
Impact damage to compressor of GE Frame MS9001FA+e gas turbine
Double rotor fault to gas turbine generator and Business Interruption

Sample Liability Experience
Numerous claims involving death, injury, theft etc at hotels and associated facilities
Product liability claims involving product recall, contamination and injuries from faulty parts
Claims from customers following destruction of a logistics warehouse by fire